Revit electrical beginner tutorial outlets lights banel board switches wiring. Correct installation is a key factor that determines long term product performance and grid reliability.Įlectrical Installation Tutorial - This can be prevented with the proper electrical installation training. Electrical Installation Tutorial For electronics tutorial please contact this number 09054158608 09261333794 09989835404 landline 213 1041. This can be prevented with the proper electrical installation training.
BUILDING ELECTRICAL INSTALLATION TUTORIAL HOW TO
Watch this super informative and detailed full video to learn about electrical in your home and discover how to tackle the most common electrical projects you ll encounter in your home. All vertical runs with open ends shall be sealed at top in case of false ceiling work, while masonry civil works going on.Electrical Installation Tutorial - For electronics tutorial please contact this number 09054158608 09261333794 09989835404 landline 213 1041. Conduits shall not be rested on false ceiling grid in any case.
Conduits above false ceiling shall run with proper supports / suspenders. Power conduits should not be run near any communication line. In case of change in direction in pipe use spring to bend the pipe. No wall conduit shall be taken haphazardly. Light point conduit shall run straight vertical to switch box. All horizontal conduit runs shall be straight at box level. The depth of chasing to have conduit recess at least 10mm from masonry wall. The width of chasing shall be limited as per number of conduits. Wall conducting activity shall start with level marking on the wall (usually box level),knowing its height above FFL(Finished floor level). After fixing the conduits, boxes, and accessories, the chiseled surface should be filled with cement mortar and chick mesh wrapped around conduits. The conduits shall be fixed with approved clips to ensure proper routing and wiring later. The wall chasing should be done with wall cutters only,this would avoid damage to walls. Chasing work shall be carried out after completion of curing of brickwork (at least 7 days gap from brickwork). The concealed conduit work shall be carried after construction of masonry walls but prior to plaster. The pull and junction boxes shall not be clustered at one place and shall be so arranged that they should not be easily seen from heavy movement areas as per electrical drawings. Pull boxes shall be provided at suitable locations. All necessary sleeves shall be provided in beams, columns, prior to slab casting as per electrical & air-conditioning. (any choke up to be documented and alternate routing to be shown in shop drawings and documented for future references). GI wire passing shall be carried out immediately after de-shuttering of slab & beam. All joints have are to be watertight joints to avoid choke up). Special precaution shall be taken during concreting of slab. All the conducting shall be checked as per services drawing, which contains locations of switchboards and number of points to be installed at each location. Wall drops shall be properly checked for face of wall/beam. Use PVC solvent for jointing the accessories Use grey PVC pipes for data and black PVC pipes for electrical wires. Preferably follow different color coding for conduits for data (LAN wire, telephone wire etc.,) and electrical wires. Only Deep junction boxes shall be used in slabs. With Binding wire, properly bind the PVC conduits.
cover to PVC Conduits incase of singly reinforced slabs. Preferably Slab conduits shall be laid in between top and bottom reinforcement. Please ensure concrete thickness i.e.
Slab conduits for house wiring should be done in 2 mm thick 25 mm size FR PVC conduits.